I promised to send a worked-out costing for going with EarthLink (datacenter) and All-Net (Sys Admin & backup). Things which need to be included: Hosting in a proper datacentre[0] Space charges[1] Power charges External internet connection (at least one for each infrastructure server) [2] Bandwidth charges [3] Inter-rack connectivity if expand to multiple racks Physical rack cabinet PDU-controlled socket for each machine Backups Remote serial console access to infrastructure servers Sysadmin on contract basis Assumptions: Space and power: 2 infrastructure servers at 2U and 200VA (~=200W) each 24 test servers at 1U and 200VA each 1 internal switch at 1U, 100VA 1 external switch at 1U, 100VA For a total of 30U, 5400VA Bandwidth: Total external 2Mbit/s 95%ile. Contract sysadmin from All-Net Computer Solutions 100h setup over one to two weeks. 4h per week ongoing (includes backup).Things NOT included (to match Jump costings): Servers, testbed systems Internal switches Internal CAT-45 wiring Multi-port serial boards Serial leads All-Net does have a guess for the hardware at $53,079 (L30,993). The proposal would involve the following invoice line items from EarthLink (Note: Quote has expired (June 11, 2014) and so may change): * Colo total rack power 4x 30A 208V 3 phase for ~4800VA per. So expected that 2 will do. Cost is based on actual use with a base add of $110/month * EarthLink setup: $935 * Consultancy $85/hr, 100h setup, 4h ongoing: $8500 setup, $1360/month. Bottom line: Total $3034/month, $9435 setup. At the current exchange rate of US$1 = UKL0.58392, that's L1772/month, L5509 setup. Notes: The power budget above is probably an overestimate, perhaps by a factor of two or so, so the bottom line I have quoted is a maximum. EarthLink's quote is for a 3-year term, they may be able offer us a "empty" 2 rack (I.E. if we expand soon, the 2 racks could be next to each other, otherwise so sort of inter rack networking can be setup). If we don't have certainty of funding for a 3-year term we can probably negotiate a shorter term with a higher commitment. I have attached a spreed sheet with all the numbers for both EarthLink and Jump. And the All-net details. -Don Slutz [0] In this case EarthLink @ Marlborough (SSAE 16 SOC2) http://www.earthlinkbusiness.com/cloud/data-center/colocation.xea [1] Earthlink has a cost per rack. [2] Earthlink actually offer 22 connections per rack. [3] Earthlink bundle 2Mbit/s 95%ile per rack. Attachment:
Wg-test-framework Document-1.pdf Attachment:
XenProjectColo.ods _______________________________________________ Wg-test-framework mailing list Wg-test-framework@xxxxxxxxxxxxxxxxxxxx http://lists.xenproject.org/cgi-bin/mailman/listinfo/wg-test-framework
|
Lists.xenproject.org is hosted with RackSpace, monitoring our |